Phase 1-South due to be completed Summer 2024

Equipped with “Cool” technology, CGC will have temperature controlled ware- houses with power provided by dedicated solar systems for each tenant. CGC will also have designated truck/trailer parking for each tenant.

 

Specs.

  • A/C Temperature Controlled Warehouses

  • Solar System per Suite

  • Insulated Walls, Truck Doors and Roofs

  • Industrial Warehouse Fans

  • Accommodate tenants ranging in size from 35,000 — 200,000 sq. ft.

  • 6-8 Covered Parking Stalls Per Suite

  • Reserved Trailer Parking Adjacent to Each Suite

  • All Docks with EODs or Pit Levelors


 